Provectus was appointed to deliver specialist remediation works for a 0.75-hectare former brownfield site earmarked for redevelopment into residential dwellings with gardens, roads, and landscaped public spaces.
Following the demolition of former buildings, asbestos-containing materials (ACMs) were identified within the made ground. Planning Conditions 25 and 26 required formal validation that all contaminated soil had been safely removed, protecting the health of future residents and ensuring compliance with the approved Remediation Strategy and Verification Plan.
Non-hazardous excavation & disposal | Made ground
Hazardous excavation & disposal | Predominantly ACMs/hydrocarbons
Imported topsoil | Certified, for tree protection zones
Imported recycled Type 1 | For haul roads & access
Excavation depth | Or to natural clay strata
The project was completed safely, on programme, and in full regulatory compliance.The site is now validated and ready for the next phase of development, providing a safe foundation for new homes and public spaces.